Monday, April 11, 2016

Why light rail?


Why not buses?
Or cars?
Why not toll highways?

For years, Metro has been trying to make driving a car as unpleasant as possible.  No new freeway expansions or improvements for decades, reduced parking requirements for infill development, "road diets" that take auto lanes and transform them into bicycle lanes, and road maintenance and bus service funding given a back seat to light rail operations and expansion.

Metro hates cars.  Or more correctly, Metro loves trains and sees cars (and buses) as the enemy of light rail.  Automobile drivers don't agree.

Why doesn't Portland embrace the idea of an expanded highway system that includes toll roads?  I went to a conference on transportation and housing in Austin,Texas last November where there are toll roads that take a large percentage of automobile (and bus) traffic off of the freeways which lessens the congestion for all.  Dallas has them too, as do other large cities.  With a growing population, Portland plods along with no highway improvements, making it one of the worst cities in the nation for time spent on congested roads. Toll roads would be great for BRT systems - but competition for LRT.  Smart Growth indeed!

The data is clear: Rail transit is not viable outside of a handful of "legacy" cities that developed prior to automobile use.  With the new Southwest Corridor Plan, Metro will exceed practical, responsible urban planning in order to promote another hugely expensive rail transit / pre-development project.  We do not need light rail to shoehorn people into the city core or town centers; If developers want to build apartments or mixed use, they can do so within walking distance of bus lines just as well.

But we're just going to let them do it, aren't we?.  The Smart Growth, "stack-em and pack-em" planners, not the road users - the majority of us, will have the last say.

MASS TRANSIT EXPANSION GOES OFF THE RAILS IN MANY U.S. CITIES

Newgeography.com, 3/17/2016  By Joel Kotkin

Journalists in older cities like New York, Boston or San Francisco may see the role of rail transit as critical to a functioning modern city. In reality, rail transit has been a financial and policy failure outside of a handful of cities.

In 23 metropolitan areas that have built new rail systems since 1970, transit’s share of commuting — including all forms, such as buses and ferries — has actually slipped a bit, from an average of 5.0 percent before the rail systems opened to 4.6 percent in 2013. The ranks of those driving alone continue to grow, having increased 14.4 million daily one-way trips since 2000, nearly double transit’s overall daily total of 7.6 million, according to Census Bureau data.

For transit to work effectively, employment needs to be concentrated. This explains why between 2013 and 2014, New York accounted for a remarkable 88 percent of the total increase in train commuting. But what works for Brooklynites headed to Union Square does  not generally work so well for people living in our increasingly dispersed metropolitan areas. Indeed in most cities — Dallas-Fort Worth, Houston, San Diego, and even the new urbanist mecca of Portland, according to 2015 American Community Survey data, where new transit lines have been put in, it has failed to increase the share of commuters who take public transportation, and in some cases the actual ridership has dropped.

One reason for the poor performance is that much of the train ridership turns out to have been former bus travelers in the first place, which limits actual gains there. Taxpayers, however, should be screaming about this switchero; the subsidy for new L.A. new bus riders, who tend to be the poorest of the poor, cost taxpayers $1.40 while the cost for a new rail rider was $25.82 over the period of 1994 to 2007. If you believe in transit as public good, clearly building more trains makes less sense than expanding bus operations.

Given what we know about the share of commuters using transit in most cities, pumping money into this form of transportation seems doubly wrong while other needs such as roads, schools, sewers and parks are neglected. Rather than try to fit all cities, and all parts of metropolitan areas, into a 19thcentury technology, maybe we should look to encourage 21st century innovation.

All this suggests we need to revamp our ideas of transit, particularly in the newer, fast-growing cities. Trains may elicit a nostalgic smile about the good old days, but most Americans, and the vast majority of our cities, need to live not in the past but in an increasingly dispersed, and choice-filled reality. Time to embrace that future.

Friday, April 8, 2016

Thoughts for the weekend


                                          Free Markets = A Free Society

While you go about your activities this glorious weekend, you may want to ponder these quotes from Milton Friedman (from Wikiquotes.com).  A free society is a precious heritage. The free market is in jeopardy.
*
There are four ways in which you can spend money.  You can spend your own money on yourself.  When you do that, why then you really watch out what you’re doing, and you try to get the most for your money.  Then you can spend your own money on somebody else. For example, I buy a birthday present for someone.  Well, then I’m not so careful about the content of the present, but I’m very careful about the cost.  Then, I can spend somebody else’s money on myself.  And if I spend somebody else’s money on myself, then I’m sure going to have a good lunch!  Finally, I can spend somebody else’s money on somebody else.  And if I spend somebody else’s money on somebody else, I’m not concerned about how much it is, and I’m not concerned about what I get.  And that’s government.  And that’s close to 40% of our national income.
  • Fox News interview (May 2004)
                             *
A liberal (libertarian) is fundamentally fearful of concentrated power.  His objective is to preserve the maximum degree of freedom for each individual separately that is compatible with one man's freedom not interfering with other men's freedom.  He believes that this objective requires that power be dispersed.  He is suspicious of assigning to government any functions that can be performed through the market, both because this substitutes coercion for voluntary co-operation in the area in question and because, by giving government an increased role, it threatens freedom in other areas.
  • Capitalism and Freedom (1962) Ch. 3 The Control of Money
                             *
I am in favor of cutting taxes under any circumstances and for any excuse, for any reason, whenever it's possible. … because I believe the big problem is not taxes, the big problem is spending.  I believe our government is too large and intrusive, that we do not get our money's worth for the roughly 40 percent of our income that is spent by government …  How can we ever cut government down to size?  I believe there is one and only one way: the way parents control spendthrift children, cutting their allowance.  For government, that means cutting taxes.
  • As quoted in Conservatives Betrayed: How George W. Bush and other big government Republicans hijacked the conservative cause (2006) by Richard A Viguerie, p. 46
                             *
One of the great mistakes is to judge policies and programs by their intentions rather than their results.
  • Interview with Richard Heffner on The Open Mind (7 December 1975)
                             *
With some notable exceptions, businessmen favor free enterprise in general but are opposed to it when it comes to themselves.
                             *
You must distinguish sharply between being pro free enterprise and being pro business.
                             *
I think it is only because capitalism has proved so enormously more efficient than alternative methods that is has survived at all. (...) I'm not sure capitalism is the right word. There is a sense in which every society is capitalist. The Soviet Union was capitalist, but it was state capitalism. Latin American societies in the past have been capitalist, but it has been oligarchic capitalism. So what we really need to talk about is not capitalism but free market or competitive capitalism which is the system that we would like to have adopted, not just capitalism.
  • Interview with Parker in Randall E. Parker(ed.), Reflection on the Great Depression (2002)
                             *

Thursday, April 7, 2016

What Metro wants

We want light rail!  
 

Did you ever think there was a doubt what they wanted?

Metro's planning efforts purport to be what local community "partners want," but the goal is about achieving a unified Smart Growth plan for the region.  And getting us to pay for it all.  The end justifies the means.

The "end" is increased density in the city and the suburbs and a planned way of living for the masses.  Suburban taxpayers will have to pay for their allocation of smart growth through the "shared investment" strategy plan of project funding.

Tigard and Tualatin voters put a stick in the wheels of the SW Corridor Plan (SWCP) light rail planning when they told Metro and their own city governments they wanted to vote on any High Capacity Transit (HCT) plans for their towns.  Metro decided to take an extra year to begin again and include the local communities in the planning process.  It appears the outcome is heading toward the same conclusion but is just further down the road with the pre-engineering analysis needed for the DEIS.

If all plans and funding were left up to a vote of the people to get the ultimate thumbs up or down, how much and what type of density, transit, funding and developer subsidies would be approved?  

The results are too risky, so that is why most planning efforts and financing are not left up to the people - and why indirect means are used to pay for projects citizens may not want but that will need public funding.  (LIDs, Grants, Urban Renewal, Tax Abatements, public amenities, etc.)

The money for transit and development comes from one place - the taxpayers.  And so many people have a stake in the light rail projects that are laid out decades in advance, the process is virtually impossible to stop: developers, the construction industry, rail industry, manufacturing, unions, politicians, bureaucrats... they can't live without (your) public funding. 

*

Staff Recommendations regarding the 
Preferred Package for the Southwest Corridor Plan



May 2016 Decisions
The decisions on mode and the PCC tunnel will complete the 18-month workplan established by the steering committee in December 2014. The workplan calls for the development of a Preferred Package of transportation investments to support community land use goals, including a preferred transit mode and terminus. The Preferred Package outlines what proposed actions will be studied in the Draft Environmental Impact Statement (DEIS) under the National Environmental Policy Act.

On May 9, 2016, the Southwest Corridor Plan Steering Committee will consider two major, inter-related questions: What is the preferred high capacity transit mode, BRT or light rail, for the Southwest Corridor? If light rail is the preferred mode, should a light rail tunnel directly serving the PCC Sylvania campus be advanced into the DEIS?

Summary of Staff Recommendations
Based on direction from the committee, technical analysis, and consideration of input from community and business groups and the general public, staff proposes the following recommendations for steering committee consideration:
  • Light rail is the preferred high capacity transit mode for the Southwest Corridor 
  • Remove the light rail tunnel alignment to PCC Sylvania from further consideration
  • Continue to explore and refine alternative options for improved transit connections to the Sylvania campus 
Higher level of public support
• Input gathered through community engagement efforts shows a clear public preference for light rail over BRT for the Southwest Corridor.

It is essential to note that Metro did NOT conduct a statistically valid survey to see what the preferred transit mode option was.


Public Input: Light rail or bus rapid transit
Throughout the last year there were several opportunities to connect with stakeholders to understand their questions, concerns and preferences regarding whether bus rapid transit (BRT) or light rail is the best choice to serve residents in the Southwest Corridor and surrounding communities. To date, project partners have collected public input on a preferred mode through open-ended questionnaires, online surveys and in-person dialogues.

During all types of public outreach, four themes consistently rise to the top when the public is asked what bene ts they want a Southwest Corridor project to deliver:
  • shorter travel time,
  • higher ridership,
  • greater reliability,
  • increased access to employment and education centers. 
Without being informed about the facts, respondents to Metro's surveys can only give their perceptions of each transit option.   Did Metro even offer the option of BRT in mixed traffic as opposed to dedicated lanes?  This type of information is anecdotal and should not be included in a report.  The questionnaires were done to satisfy public input requirements.  

Open-ended survey questions and in-person discussions provided a sense of how the public views the trade-offs between the mode options and their perspectives in selecting their preferred mode.The largest number of open-ended comments were in support of light rail, citing the need to think long-term, higher ridership capacity, automatic exclusive right of way and more positive public perceptions of light rail as comfortable and modern. Comments in support of BRT cite the perception that BRT is more flexible, it doesn’t require fixed infrastructure, that the fleet is easier to upgrade than MAX, lower construction costs and public perception that MAX is unreliable. 


*

Officials take a ride on new Orange Line train
Portland Tribune  Friday, 15 May 2015


TRIBUNE PHOTO: JOHN M. VINCENT - Nearly 400 invited guests joined TriMet and light rail car manufacturer Siemens Friday to celebrate the first full-speed passenger-carrying run on the MAX Orange line from Downtown Portland to northern Clackamas County. The route is expected to open to the public in September.


Comment:



A Smart Growther's Hootenany. I will be more impressed the second time these folks ride this line, which will be never,

Wednesday, April 6, 2016

Celebrating Arbor Day



Let's Celebrate!  
It's Arbor Day / Week / Month 

Last year I joined in the festivities by having a week full of tree-related posts.  It was fun.  (Look up April 2015 in menu bar for the series.)

This year I decided to to play Scrooge to this made-up holiday and show how far Lake Oswego's love affair, religious adoration, with trees has come. I will compare LO to neighboring cities to demonstrate how out-of-control the city has become with advancing special causes and spending your money.  All cities below have Tree City USA designations.  

USC NOTE:  I love trees too.  If people love to hug trees in a communal way, more power to them.  But like a lot of other activities in the city that are bloating our government, these should be sponsored by a citizen group, independent of the city.

Lake Oswego:
Proclamation by Mayor
Heritage Tree Bike Ride: Staff time
Hello LO City Newsletter: Full page, 2-sided, full color insert in Hello LO sent to all LO households, printing, staff time, professional graphic design services
Arbor Week Festival:  live music, kids'crafts, refreshments, prizes, staff time, materials
Heritage Tree Celebration:  Staff time, refreshments (Full-color Heritage Tree Maps?)
Barnyard Tales and Heritage Tree Walk:  Storyteller, staff
Make Your Own Paper:  teacher, staff time, library use, materials
Preschool Walk in Springbrook Park:  Staff time, educator (volunteer or paid?), craft materials
Tree and Native Planting Event:  Staff time, materials, refreshments
City Publications:  full-color glossy brochures - Heritage Tree Guide; Right Tree, Right Place; Invasive Plants; Professional graphic design services, staff time 
Poetry Contest:  Staff time, prize packs, library use, printed copies of poems,
Free the Trees:  Volunteer Labor, staff coordination
Workshops onTree Pruning; Native and Invasive Tree Identification: Staff Time, school use, refreshments

Tigard
Events are planned all month long. Highlights include:
Mayor Proclamation
Library - Book Display and Reading List: Staff time 
Library - Toddler Time (Ages 24 to 36 months): Staff time
Library - Family Story Time (Ages 0 to 6 years):  Staff time
Arbor Month Update and Tree City USA Award

Tualatin
Mayor Proclamation
5th Grade Poster Contest:  Staff time
"Tualatin Trees" Photo Contest:  Staff time
Lecture on Redwood Ecology:  building use
Library -Tree-themed Crafts:  Building use, staff or volunteer time, materials
Tree-Planting Events:  Staff time, materials

Oregon City
Mayor Proclamation
Help plant trees at Hillendale Park:  Staff time, materials

Council Meeting Updates


Updated City Calendar:

The City Calendar has been updated to show the April 19 City Council Meeting.  However, there are still no meetings scheduled past that date.  All the other Boards and Commissions have their regular meetings on the calendar - just not the Council.   Huh?

Is there a question about whether there will be regular meetings in the future?


Public Comment at City Council Meetings

Similar problems from England - being banned from giving public comment at Council meetings. From Shropshire, England:  Andy Boddington, Shropshire Coucillor for Ludlow North.    The plan to prohibit public comment was picked up by the newspaper and became a local controversy.  I guess that even if the cause is a good one - the ethical one - it takes a powerful group to effect a political change.  Is there an Andy Boddington on our City Council?


Posted 2/20/2016 by andybodders

The new council leader has backed down on plans to prevent members of the public asking oral questions at full council meetings. He had proposed that members of the public would be allowed to ask questions in writing only, without the option of asking a supplementary question arising from the answer.

When Keith Barrow ran the council, there was a preference to keep as much as possible out of the public gaze. That habit seems to be continuing under Malcolm Pate. Secret portfolio holder sessions are still being held to make vital decisions. And this attempt to ban public speaking at council was ill judged.

Making transit connections

Lake Oswego IS in the Southwest Corridor

Metro thinks so.  A lot of people agree.  why they are wanted?   I've said before that transportation and urban renewal plans are all about development, but this post is more about what, not why.
How can anyone deny geography?  But geography can be complicated with overlapping jurisdictions and changing land use plans.  How does Lake Oswego fit into the Southwest Corridor Plan?  What is the final plan for the area?   These are the things "they" never tell you.  You may agree with the transportation plans, but wouldn't you like to know

Original planning for the Southwest Corridor Plan included a representative from Lake Oswego. on its steering committee.  LO mayor, Kent Studebaker, wrote a letter to Metro excluding Lake Osego from participation in the SWCP as a "partner", but he couldn't move the city or put up barriers to keep traffic out.  Partner status would have committed the city to financially support the plan.  But are we committed anyway?

             Neil McFarland, Trimet General Manager, Southwest Service Enhancement Plan Final Report
             12/2015:
             Over the past year and a half, TriMet has engaged the communities of Durham, King City, Lake    
             Oswego, SW Portland, Tigard, Tualatin, Sherwood, and West Linn in a process to develop the 
             Southwest Service Enhancement Plan (SWSEP), a long-range vision to improve bus service and bus 
             stops, and to recommend pedestrian improvements. 

The Tigard Triangle is connected to the SWCP as it includes the HCT route within it.  A quick look (well, not so quick to find) at the Tigard Triangle Strategic Plan  (Fiinal Plan, March 2015) shows several active transportation (pedestrian and bicycle) projects that include Lake Oswego.  Some of these projects were taken off of the City's TSP maps (those on private property), but others exist that may surprise.  The TIgard Triangle Strategic Plan included Lake Oswego's Transportation Engineer on its Technical Advisory Committee, so someone in the LO knows what is in the Plan.

            Southwest Service Enhancement Plan Final Report 12/2015:
            Opportunities for Action
              TriMet will continue to partner with local cities, counties and ODOT to improve pedestrian 
              environments. However cities, county and ODOT must also make pedestrian improvements a high 
              priority. 

The Southwest Employment Area is in the Southwest Corridor Plan area.  TriMet's Service "Enhancements" change of South Shore Route, #36 to go through the district will service employers/employees - and future development.

              Southwest Service Enhancement Plan Final Report 12/2015:
              Downtown Lake Oswego to King City (Line 36)
              Extend the South Shore Boulevard line from the Tualatin Park & Ride to King City via 
              72nd Avenue and Durham to improve east-west connections between Lake Oswego, Tualatin, 
             Tigard, and King City, and add trips. Extend the line to Jean Way to better serve businesses 
             in the Lake Oswego Commerce Center.  

The Kruse Way Employment Area is in the Southwest Corridor Plan area.
  1.    Southwest Service Enhancement Plan Final Report 12/2015: 
       As employment grows throughout the region, long gone is the day when Downtown Portland was
  2.    the only concentration of jobs. While there will always be strong demand for fast, frequent transit
  3.    service to Downtown Portland, there is also more need than ever for transit service within 
  4.    Southwest, particularly in employment areas with a large number of entry level and middle wage 
  5.    jobs such as: 
    • Kruse Way/Meadows Road 
CONNECT THE DOTS

From Southwest Corridor Plan: Vision and Context 12/2012


From Southwest Corridor Plan, Key Issues: Tigard  Final Review Draft  9/2015

From Tigard Triangle Strategic Plan, Final Draft  9/2015


From Tigard Triangle Strategic Plan, Final Draft  9/2015

From Trimet Southwest Service Enhancement Plan for Future Service (current)



From Metro Regional Active Transportation Plan 2015



Sunday, April 3, 2016

Transit for the few

TriMet Southwest Service Enhancement Plan

It's been just over a year and a half since Trimet presented its Draft Southwest Service Enhancment Plan to streamline bus service to Metro's Southwest service area which includes Lake Oswego.  Route changes were proposed for several routes, but #36 was left in its existing configuration.

That plan didn't last long.  


Trimet's Final Report/Vision of the Future of their"Enhancement" Plan dramatically changes the South Shore Route #36.  This route is the only transit alternative for the city of Rivergrove and the Rosewood neighborhood, but the new plan wipes them off the map.

Why? 

Low ridership?  When the bus hours and and days are reduced, transit usage goes down as it has throughout the city and Metro area for years now.  TriMet is killing bus transit to get people to use light rail now.  How do people get to and from the train stations without a car and convenient lots?  What if a potential user doesn't drive?

The REAL reasons?  

To support the Southwest Corridor Plan.  The SWCP will have a bus or train station at Bridgeport.  The SW Corridor Plan supports development in SW Portland, Tigard, Tualatin, Sherwood, and eventually, Newberg.  If high capacity transit takes lanes of roadway out of service, it won't relieve congestion, but no matter, it will be a boon to developers who see fixed transit routes as an amenity.  Metro planners have admitted their HCT plans won't reduce travel time or congestion at all.  In essence, all transit plans these days are to effectuate higher density development and not to support existing neighborhoods.

TriMet used to have a comprehensive bus system that served the "last mile."  Real people, right now, are being sacrificed for the elites' utopian dreams of mixed-use, walkable and bikeable station communities where the masses will live car free.

Another, not insignificant loss, is Trimet's LIFT service which only operates within 3/4 miles of established bus routes, and only during the operational hours of the routes.  Limited routes and limited hours mean limited or no access for those who have no other transit options.

Draft SW Service Enhancement Plan (7/2014)


Final Vision (12/2015)
Read the Final Report - Link above.




Challenge:  The next time you go to a meeting where a transit official, planner, politician, activist or bureaucrat talks about the need to use transit, ask them how they got to the meeting, and how they are getting home.  Then ask them why.

Saturday, April 2, 2016

What you don't know

If you don't know what you don't know -
What questions do you ask?
What things do you ask for?
How do you do that?!


If you go to the City's main website and click on "City Meetings," you should be able to see all of the City Council's meeting dates.  If you looked at the calendar as it was this week, there is no meeting scheduled past April 5.  Perhaps everyone is going on vacation?  Maybe there is nothing for the Council to do.


Looking further at the City Council/Redevelopment Draft Schedule, there is a lot going on.  You just have to know where to look.

Please note some critical issues and dates that are coming up quickly.


April 19 Study Sessions for:
ORD 2709  Lake Grove Village Center Overlay District Code  (LU 15-0064)
ORD 2707  Lake Grove Village Center Parking Management Plan  (LU16-0001)
ORD 2706  Southwest Employment Area Plan  (LU 15-0077)

 A lot going on in Lake Grove and the Industrial Area.  How will these districts be changed?

May 3  Public Hearings
Public Hearings for the ordinances listed above.  
Speak now... Better yet, write the City Council a letter or send an email with your thoughts.



Friday, April 1, 2016

Yay! Affordable housing!

Still can't afford a house in Lake Oswego or Portland? 
Read on.

Metro's claim, and all Urbanists' claims, that young people want to live in apartments in urban environments and eschew the burdens of single family homes, is false.  People will go to great lengths (literally) to buy a house of their own.  The American Dream is not dead, but it is being devoured by Smart Growth/New Urbanism.

The livability issues brought about by Smart Growth adherents can fill a book.  For every upside, there is a downside.  Bureaucrats either ignore or misrepresent the downsides of their agenda - like the preference for single family houses.  In the meantime, a generation will become city rats, envious of those who fare better, when all the time it was their government who *7%$#@** them out of owning a home.

Top Ten Places Where Millennials are Buying Houses
Fortune, March 3, 2016.  By Johnathan Chew

Here's where they can actually afford to buy.

But for those with the bucks for a down payment, the big question is, Where are they buying?

Their answers may surprise you.



Thursday, March 31, 2016

Budget breaker


The Fly in the Ointment


P.E.R.S.

The Oregonian article referenced below says it best.  The PERS system is 20% underfunded, and government entities will face horrendous rate increases necessitating personnel and or service  reductions.  At the current time, Lake Oswego struggles to find Minh for infrastructure maintenance and capital improvements.

Personnel costs (salaries, health, PERS and other benefits) make up the largest part of the city's General Fund.  All other general fund expenses compete with staffing.  With NO staff cuts, the increasing PERS rate increases will engulf more and more of the general fund.  No city, county, school district or any public agency can afford this.

PERS costs to soar in 2017 and beyond, clobbering Oregon
Oregonlive, November 28, 2015, By Ted Sickinger

State public pension officials are holding town hall meetings around the state to warn schools, cities and public agencies that they will be clobbered by an unprecedented string of pension cost increases starting in 2017.

That is expected to be followed by persistently high contribution rates that will strap public budgets for at least a decade. 

In order to bail out, PERS will need to raise public employers' contributions to the system by about 4 percent of their payrolls in each of the next three budget cycles. And that implies public employers will need to tap their budgets for an extra $800 million per biennium starting in July 2017, another $860 million in 2019 and an additional $930 million in 2021.

The size of the financial hit makes it a material problem for every Oregonian. It's billions of additional dollars that will be redirected to the pension fund instead of funding teachers, school days, reduced class sizes, police, firefighters, transportation projects and so on.

All told, statewide pension costs could eventually increase by about $2.6 billion each biennium. That comes on top of the $2 billion employers are paying today. 


Cheri Helt, a restaurant owner and member of the Bend-Lapine School Board, said the last time her district saw significant PERS cost hikes, it was forced to eliminate 100 teaching positions.

"So we're now going into a more vicious downturn and we have not even recuperated yet," she said. "We've never seen anything like what's being proposed." 

All told, statewide pension costs could eventually increase by about $2.6 billion each biennium. That comes on top of the $2 billion employers are paying today. 

For entire article, use link above.  There are also links to related stories.


A "gig" economy


Wall Street Journal, March 2 , 2016. 
Business - By By ANNA LOUIE SUSSMAN and JOSH ZUMBRUN

Silicone Valley "Gig" Economy Spreads Broadly

New research shows labor shift affects health care, education and other industries that have traditionally offered stable employment 

Excerpts:
As com­pa­nies look to shed non­core tasks and gov­ern­ment bud­gets come un­der strain, an ex­pand­ing share of the work­force has come un­teth­ered from sta­ble em­ploy­ment and its at­tendant ben­e­fits and job pro­tec­tions.

The rise has hap­pened even across in­dus­tries in­clud­ing health care and ed­u­ca­tion, man­u­fac­tur­ing and pub­lic ad­min­is­tra­tion, with pro­fes­sions that have tra­di­tion­ally of­fered sta­ble employ­ment.

For ex­am­ple, they es­ti­mate the share of work­ers in al­ter­na­tive arrange­ments has more than dou­bled to 11% in man­u­fac­tur­ing and to 16% in health and ed­u­ca­tion. It has quin­tupled, to 10%, in pub­lic admin­is­tra­tion.

Nor have white-col­lar in­dus­tries been im­mune from the shift. The num­ber of work­ers in al­ter­na­tive arrange­ments, for ex­am­ple, in the le-gal in­dus­try has nearly dou­bled over the past decade. The busi­ness process out­sourc­ing in­dus­try—es­sen-tially white-col­lar con­tract­ing firms—had $136 bil­lion in rev­enue last year and has been grow­ing 4% a year since 2000, ac­cord­ing to the in­dus­try re­search firm IBIS­World.

Com­pa­nies seek­ing to re­duce in-house op­er­a­tions have many op­tions. Large staffing agen­cies like Adecco SA, Man­pow­er­Group Inc. and Kelly Ser­vices Inc. can place work­ers into a grow­ing range of roles—in­clud­ing higher ed­u­ca­tion, gov­ern­ment and health care.

In other cases, com­pa­nies con­tract out to shed ben­e­fits they pay to full-time staff, to fo­cus on core com­pe­ten-cies, or to dis­tance them­selves from li­a­bil­ity costs.

Even fed­eral, state and lo­cal gov-ern­ment in­creas­ingly use con­trac­tors through­out their ranks to carry out ad­min­is­tra­tive, man­age­ment and in-for­ma­tion tech­nol­ogy tasks.

A Con­gres­sional Bud­get Of­fice re-port last year said spend­ing for these gov­ern­ment ser­vices had nearly dou-bled be­tween 2000 and 2012, af­ter ad­just­ing for in­fla­tion, ac­count­ing for about $260 bil­lion of spend­ing. The con­tracts were so wide­spread and com­plex that CBO said it was un­able to quan­tify how many peo­ple were in this con­tracted work­force.

Mr. Weil of the La­bor De­part­ment dubbed this econ­o­my­wide phe-nomenon the “fis­sured work­force,” the ti­tle of a 2014 book he wrote on the topic. The new RAND re­search pro­vides the broad­est con­fir­ma­tion to date that these trends are grow­ing. 

DISCLOSURE:  USC is currently a recipient of PERS benefits from a job many, many  moons ago. PERS benefits will continue to deliver a stable, generous retirement to long-term employees no matter their income or the financial condition of the government agency, due to rate increases the agencies are required to pay.  (Number 9 of the top PERS recipients in the state is Bill Korach who receives $250,395. Until the governent entity goes broke and can't pay any of its bills.  What can the poor, beleaguered government agencies (taxpayers) do?  Plenty.  Read more in future posts.